IESCO has shifted from ENC to e-OPS. New connections are now applied for through the Power Smart app or IESCO Smart App, or at your nearest Customer Facilitation Centre. Do not use the old ENC website for a new IESCO application.
How to apply
Step 1
Open the Power Smart app or IESCO Smart App, or visit your nearest Customer Facilitation Centre. Use only the official portal linked from iesco.com.pk.
Step 2
Fill in the application form with the applicant’s name, CNIC, address of the premises and the load / connection type required.
Step 3
Upload the documents the form asks for — commonly: CNIC copy, proof of ownership or tenancy, and a recent paid bill of a neighbouring connection. Confirm the current list in the app before submitting.
Step 4
Note your tracking ID after submitting, and use it to check the application status on the same portal or app.
Step 5
After inspection and approval, pay the demand notice / connection charges through the method stated on the notice, after which the meter is installed.
Note: Connection charges depend on connection type and distance — confirm the current demand notice amount in the app before paying. Do not quote a fixed fee as final.
Frequently asked questions
Can I apply for a new IESCO connection online?
Yes, applications are submitted through IESCO’s online connection system rather than by visiting an office first. Use only the official portal linked from iesco.com.pk.
How long does a new connection take?
Timing depends on inspection, load and local workload. Your tracking ID shows the current stage of your application. For loads up to 15 kW, IESCO aims to connect within 30 days.
What if my online application is rejected or stuck?
Check the reason shown against your tracking ID, correct the document or detail named, and resubmit. If it remains stuck, contact your local IESCO sub-division office with your tracking ID.
Check your IESCO bill online using the homepage checker.
Related guides: Check your IESCO bill online | IESCO Tariff 2026